ENGINEERING & DOCUMENTATION

Define the document pack before you commit.

Bring the selected model, destination and local review team into one document schedule, with clear authorship, revision and acceptance responsibilities.

Request a document-scope review
  • Controlled configuration
  • Named document owners
  • A destination-specific review route
Design-review diagram · not to scaleDrawing revision and material identity stay linked to the inspection and acceptance record.Geometry and quantities are symbolic. No dimensions, grades or capacities are specified.

A document schedule supports coordination. It does not establish a local permit, certification or engineering approval.

VISIBLE REFERENCE · DEFINED EVIDENCE

Put the right information beside the right detail.

English-redrawn reference diagramHA-01 detachable-system catalogue diagram identifying frame and enclosure components.
English component key 18 callouts
  1. 0150 × 50 grooved roof purlin
  2. 0240 × 80 roof purlin
  3. 03Panel-retaining channel
  4. 0440 × 60 roof purlin
  5. 05Carriage bolts
  6. 0650 / 75 mm rock-wool sandwich panel
  7. 07Column — source designation 160 × 2.3
  8. 08Corner fittings — 8 pcs
  9. 09Grooved base-frame short beam — 160 × 2.3
  10. 1040 × 80 floor joist
  11. 11Roof sheet
  12. 12Glass-wool insulation
  13. 13Ceiling liner sheet
  14. 14Steel door
  15. 15Single-glazed uPVC sliding window
  16. 1616 mm MgO floorboard — source diagram label
  17. 17Grooved base-frame long beam — 160 × 2.3
  18. 1880 × 80 floor joist

The illustrated schedule labels a 16 mm MgO floorboard; the English schedule states 18 mm. Confirm the current model BOM and drawing before quoting the floor thickness.

01

Resolve conflicting labels on the current BOM.

The visible diagram labels a 16 mm MgO floor while the English schedule states 18 mm. A quotation should use the current model BOM and drawing revision, rather than silently selecting one value.

  • Keep HA-01 separate from the FP-01 flat-pack specification.
  • Confirm external and clear internal geometry on the current general arrangement.
  • Resolve material, thickness and connection discrepancies before production.

Ask for: current general arrangement, BOM, revision history and a closed clarification list.

Design-review diagram · not to scaleScope diagram distinguishing factory distribution / entries from local supply and connections.Geometry and quantities are symbolic. No dimensions, grades or capacities are specified.
02

Document the interface that continues on site.

The building package and the local works must meet at defined interfaces. Mark the agreed supports, service entries, completion scope and inspection responsibilities in the project documents.

  • Identify support reactions and the local foundation / anchorage design owner.
  • Mark electrical, water, drainage and mechanical connection positions.
  • Allocate factory inspection, site testing and final commissioning.

Ask for: interface drawings, scope matrix and the factory / site handover document list.

PROJECT REVIEW SCHEDULE

Build a document schedule with named owners.

Document packageContent to requestOwner / review to agree
ConfigurationGeneral arrangement, opening locations, room layout, material schedule, finishes and revision.Supply team prepares the selected configuration; buyer reviews the operating brief.
Structural / envelope basisApplicable design basis, model geometry, design actions, connections, enclosure build-up and relevant evidence.Responsible engineers define and review the project basis; local requirements identified before order.
Factory and site interfacesSupport reactions, anchorage information, service entries, packing, handling and site completion scope.Supply and local design / installation teams coordinate the boundary.
Release and handoverAgreed inspection records, material / component identification, assembly guidance, maintenance and warranty documents.Named parties review the agreed deliverables and outstanding items before acceptance.

RESPONSIBILITIES & COMMERCIAL SCOPE

Agree which evidence belongs to which party.

01

Supply documentation

The quotation identifies which model drawings, records and instructions will be provided.

02

Local design and approvals

The buyer identifies the jurisdiction, intended use and local professionals / authorities involved.

03

Review and revision

Agree submittal timing, review cycles, clarification ownership and the event that freezes production data.

MODEL-SPECIFIC DOCUMENT REQUEST

Identify the documents your project actually needs.

A drawing or test report is useful only when its model, revision and scope match the building being purchased. Request the required package early.

01

Layout and specification

Request the current general arrangement, clear opening locations, selected materials, finishes, BOM and revision identification.

02

Connections and interfaces

Identify the required frame and module connections, fastener schedule, support information, anchorage and service-interface drawings.

03

Evidence and its scope

List required structural calculations, material or assembly test reports and electrical documentation; confirm the tested construction and applicable jurisdiction.

04

Review ownership

Name the document author, recipient and local reviewer; confirm which items are available, their timing and any separate engineering cost.

QUESTIONS BUYERS ASK

Frequently asked questions.

Review the decisions that matter for this stage of your project.

What documents should I request with a quotation?

Identify the general arrangement, model bill of materials, finish and service schedule, packing list, interface details and any required inspection or test evidence. Confirm availability and delivery timing in writing.

Can catalogue drawings be used for permit submission?

Treat catalogue drawings as reference material. The authority and local design team determine whether project-specific, reviewed or professionally sealed documents are required.

Are test reports valid for every configuration?

No. Verify the tested construction, materials, dimensions, report scope and local acceptance against the proposed model. Substitutions may require additional review or evidence.

Who obtains local permits?

The responsible party must be agreed in the project contract. Share the use, jurisdiction and local contacts early so submissions and professional services can be scoped and priced.

YOUR NEXT STEP

Request a document-scope review.

Share the inputs below so the selected configuration, document package and service boundary can be reviewed together.

Request a document-scope review

The enquiry page prepares a project brief for review and export. It does not send to a sales inbox in this edition.

Include in your brief

  • Country, state / province and municipality
  • Intended use and selected model
  • Local design / approval contact
  • Required drawing, calculation and report list
  • Document format, language and submittal schedule
Use the project checklist