TECHNICAL & DELIVERY

Know what connects. Know what is included.

Review the building, the evidence and the site interfaces as one project. Specify the details before committing to a supply scope.

Structure & frame

Inspect the structural package.

Read the frame as members, connections, design inputs and inspection records. Each visual below addresses one part of that review.

English-redrawn reference diagramThe detachable-system diagram identifies roof purlins, beams, posts and floor supports.
English component key 18 callouts
  1. 0150 × 50 grooved roof purlin
  2. 0240 × 80 roof purlin
  3. 03Panel-retaining channel
  4. 0440 × 60 roof purlin
  5. 05Carriage bolts
  6. 0650 / 75 mm rock-wool sandwich panel
  7. 07Column — source designation 160 × 2.3
  8. 08Corner fittings — 8 pcs
  9. 09Grooved base-frame short beam — 160 × 2.3
  10. 1040 × 80 floor joist
  11. 11Roof sheet
  12. 12Glass-wool insulation
  13. 13Ceiling liner sheet
  14. 14Steel door
  15. 15Single-glazed uPVC sliding window
  16. 1616 mm MgO floorboard — source diagram label
  17. 17Grooved base-frame long beam — 160 × 2.3
  18. 1880 × 80 floor joist

The illustrated schedule labels a 16 mm MgO floorboard; the English schedule states 18 mm. Confirm the current model BOM and drawing before quoting the floor thickness.

Catalogue arrangement only. Its floor label reads 16 mm while the English schedule says 18 mm; resolve that discrepancy on the current BOM. The drawing does not establish steel grade or capacity.

The illustrated HA-01 source contains a 16 / 18 mm floor-board discrepancy. Confirm the current BOM before selecting the floor build-up.

Review the connection requirements →

From specification to site handover.

Define the supply boundary.

The quotation and contract should allocate each work package. This is a coordination checklist, not a statement that every service is included.

Work packageSupply-side scope to agreeLocal / buyer scope to agree
Building shell & internal configurationSelected drawings, BOM and finishesSelect and approve the scope
Engineering & local approvalDocument scope agreed before orderLocal design review, permits and authority coordination
Foundation & anchorsProvide agreed module interface informationSite investigation, foundation design and site execution
Packing & transportPacking / delivery to the named contractual pointDestination customs, inland / unloading scope as agreed
Assembly & liftingModel-specific method; overseas personnel assessed and quoted separatelyCompetent installers, equipment and site safety arrangements
External utilities & commissioningFactory service scope and interfaces as agreedLocal connections, licensed work and final commissioning

QUESTIONS BUYERS ASK

Frequently asked questions.

Review the decisions that matter for this stage of your project.

Which technical information is needed before ordering?

Start with destination, building use and configuration. Then define the required drawings, material schedule, design basis, interfaces, inspection records and local approval pathway.

Who designs the foundation and anchors?

Allocate this in the contract. The foundation designer needs site conditions, verified support reactions and the selected module interface; the local team must review the site-specific solution.

Does a component test report prove the whole building is approved?

No. Check the tested product or assembly, construction, scope and applicable jurisdiction. A component result does not automatically establish a complete building rating or local approval.

What work may remain after delivery?

Depending on the agreed package, the site may need unloading, assembly, anchorage, weather sealing, utility connections, testing and inspections. List responsibilities and exclusions in the quotation.

YOUR NEXT PROJECT

Tell us about your project.

Start with your location, application and expected scale.

Review your project details before exporting your enquiry.