Start with the prepared site interface.
The local team should know the ground, access, foundation and service conditions before setting an installation date. The selected module data then informs support, anchorage and handling coordination.
- Identify local permissions and the responsible foundation / site-design team.
- Review supports, levels, drainage, access and utility readiness.
- Agree unloading equipment, temporary storage and the work area.
Ask for: site-readiness checklist, support / interface information and the local preparation responsibilities.